Zoning Regulations in Northridge

Special zoning regulations apply to ADU construction in Northridge. Our team is fully aware of all these rules. ADU construction is allowed in residential areas, but it is necessary to follow some specific guidelines. We will tell you which zone your property falls in and what rules apply accordingly. It is necessary to build an ADU as per the municipal rules.

Zoning Regulations

ADU Size Limitations

Lot Size Table

Plot Size Single family (maximum floor area) Duplex and Multi-Family (Maximum floor area)
6,000 1,400 sqft 900 sqft
8,500 1,700 sqft 1,100 sqft
11,000 2,000 sqft 1,300 sqft
16,000 2,600 sqft 1,800 sqft
21,000 3,200 sqft 2,200 sqft

ADU Height Limitations

The height rules of the ADU in Northridge are very important. The height of the ADU should be less than the height of the main building. The maximum height of the ADU can be up to fifteen feet. Height limits may vary in different regions. According to municipal rules, the height of the detached ADU should be less than the main house.

Building coverage

Building coverage means how much area can be built up on your property. A maximum of forty percent of the total area of the plot can be covered in Northridge. This limit is fixed by combining both the main building and the ADU. We will tell you how much can be constructed on your property.

Location

Single-Family Homes:

  • Detached ADUs: Separate ADUs should be constructed at least ten feet away from the main building. Our team will help you select the right location.
  • Attached ADUs: Connected ADUs are integrated with the main building. Their entrance should be separate and privacy should be maintained.

Duplexes and Multi-family:

  • General Requirements:  Special rules apply for ADUs in duplex and multi-family properties. We will make you aware of all these rules.
  • Zoning Specifics:  It is necessary to follow special zoning regulations. Our team will provide you with information on all zoning specialties.

Exterior details

The exterior design of the ADU should match the main building. The color, material and architectural style are carefully selected. We create a design that enhances the beauty of your main home. ADU’s windows and doors are installed keeping in mind the privacy of neighbors.

Parking

Parking rules are important for ADU in Northridge. A parking space is required for each ADU. Exemption from the need for parking may be incurred in certain circumstances. The movement of vehicles is taken into account while selecting a parking lot.

Setbacks and Buffer Zones

Setback rules ensure proper distance between ADUs and neighbouring properties. A setback of at least twenty feet at the front is required. The side and rear setbacks should be five feet. Buffer zones ensure the privacy and security of neighbours.

Minimum Lot Area (RF Zone)

Zone Table

zone Minimum plot area
R-22 5,500 sqft
R-12 8,000 sqft
R-8 11,000 sqft
R-6 16,000 sqft
R-3 21,000 sqft

Connection For Utilities

Proper utility connections are essential for ADUs. Water, electricity and sewer line connections can be obtained from the main building or directly from the municipal line. Our team ensures that all connections are secure and in accordance with the regulations. Utility meters are installed separately.

It is important to evaluate existing utility lines. We ensure that the existing system can handle the extra load. Upgrades are planned if necessary. Our team helps you get all the necessary permits.

Fire Safety

Fire protection is an important aspect of ADU construction. It is mandatory to install smoke detectors and carbon monoxide alarms in each ADU. The size of windows for emergency exits should be as per the prescribed standards. The availability and location of the fire extinguisher is also important. All the necessary equipment for safety is installed in the right place.

Room Specifications

Room Specifications

  • Sleeping Areas: The minimum size of the bedroom should be seven hundred square feet. The room should have a window for natural light and air. The height of the ceiling should be at least seven and a half feet. There should be a provision of wardrobe or storage space in the room.
  • Kitchen: The counter space in the kitchen should be at least six feet long.  There should be proper space for sinks, stoves and refrigerators. Ventilation and electrical outlets are installed in accordance with the regulations. There should be a provision of adequate storage space in the kitchen.
  • Bathroom: It is mandatory to have a shower or bathtub, toilet and wash basin in the bathroom. A window or exhaust fan is a must for ventilation. Waterproof tiles are installed on the floor. The minimum size of the bathroom should be thirty square feet.
  • Storage Spaces: Provision of storage space should be in every room. The design of shelves and shelves should be modern and practical. There should be separate space for linen closet and coat closet. Storage units are constructed from durable materials.

Short-term Rentals and Home Occupations Regulations

Northridge has special rules for renting ADUs short-term. Additional permits may be required for short-term rentals. Some restrictions apply to using ADUs for home occupation. Special permits may have to be obtained for commercial activities. Our team will provide you with all the rules information.

Building Codes

Northridge’s building codes play an important role in ADU construction. All construction work must conform to California building codes.  Special codes apply for electrical, plumbing and mechanical systems. Adherence to these codes ensures safety and quality. Our team adheres to all standards.

ADU Permit Northridge Guidelines

The process of obtaining a permit is completed in several stages. All necessary documents and plans have to be prepared. We provide you with guidance at every step. Help in getting approval from the Municipal Corporation. Permits strive to make the process simpler and faster.

Permit Cost Table

Permit Type cost
Building Permits $2,500 – $5,500
Electrical Permit $300 – $600
Plumbing Permit $250 – $450
Mechanical Permit $200 – $400
Demolition Permit $150 – $250
Landscaping Permit $75 – $150

Property Requirements

The property is required to meet certain special criteria for ADU construction in Northridge. The plot size should conform to the minimum requirements. There should be enough space for ADU along with the main building. The slope of the land and the condition of the soil are evaluated. It is also necessary to follow environmental regulations.

Parking

Parking arrangements play an important role in ADU construction. An additional parking lot is required for each ADU. The size of the parking lot should be suitable to accommodate the standard vehicle. Alternative parking arrangements should be made in case the garage is converted into an ADU. Properties near public transport may get some relaxation.

Front setbacks

Setback rules at the front control the visibility of the ADU. The distance of the ADU from the main road should be at least twenty feet. Landscaping can be done in the setback area. The view of ADU from Street View should be eye-catching. The privacy of neighbouring properties is taken care of.

Side and rear setbacks

The side and rear setbacks ensure proper distance from neighbouring properties. A setback of at least four feet is required on both sides. A setback of five feet has to be kept at the back. Enough space is left for utility lines. This distance is important for fire safety.

Open space and rear yards

The provision of open spaces and a back courtyard enhances the quality of life. The minimum area of the back courtyard should be three hundred square feet. There should be space for children to play and outdoor activities. Provision of space is made for landscaping and greenery. Natural light and air flow are maintained.

Properties That Qualify

Identification of eligible properties is important for ADU construction in Northridge. Single family housing, duplexes and multi-family buildings are eligible for ADUs. The size of the plot and the current building coverage should be within the limit of permit. According to zoning rules, the property should be located in the appropriate area. Availability of utility connection is also important.

Parking arrangements and access roads should be suitable in eligible properties. Properties located in disaster-prone areas may require special approvals. Our team determines the qualifications by evaluating your property. Adherence to environmental and safety standards is ensured. All requirements are met as per municipal rules.

Development Standards

Single-family

  • Attached: Special standards apply for connected ADUs in single-family homes. Integrated design with the main building is important. The entrance to the ADU should be separate. The exterior appearance should match the main building. Internal connectivity is not allowed. Special construction techniques are used for safety and fire prevention.
  • Detached:  There are more possibilities of independent design in separate ADU construction. The minimum distance from the main building should be ten feet. The height must be less than the main building. Independent utility connections are arranged. There are separate arrangements for parking and access roads. Special attention is paid to privacy and security.

Duplex properties

  • Attached: Duplex properties have complex rules for attached ADUs. The entrance to each unit should be different. Utility meters are installed separately. Provision of sound proofing and fire rated walls is essential. Special attention is paid to the privacy of residents.
  • Detached: Special rules apply in ADU construction different from duplexes. Proper distance has to be maintained between all the units. Parking arrangements should be separate for each unit. Proper management of landscaping and open space is done. Shared use of community facilities is ensured.

Multifamily properties

  • Attached:  There are detailed rules for connected ADUs in multi-family properties. The capacity of the existing building is assessed. The use of common areas and facilities is controlled. Special provision of emergency evacuation route is made. The safety of all residents is ensured.
  • Detached:  Location management is important for separate ADUs in multi-family properties. Parking and walkways should be convenient. Utility connections are different for all units. Effective use of community spaces is ensured. The needs of the residents are taken care of.

Junior ADUs (JADUs)

Junior ADUs are small residential units that are built inside the main building. Their size is less than five hundred square feet. Kitchen facilities can be shared with the main house. Provision of separate entrance is necessary. Bathroom facility is mandatory. No additional parking is required.

Property Designations

Property Designations

  • Flood Zones: Special precautions are necessary for ADU construction in flood prone areas. The floor level should be above the projected level of flooding. Proper drainage arrangements are made. Special building materials are used. Additional insurance may be required. Emergency plans are developed.
  • Geohazard Zones: Special studies are necessary for construction in geologically hazard areas. The stability of the soil is tested. Earthquake resistant design is used. The foundation is made stronger. Experts’ advice is taken. Regular inspections are required.
  • Historic Designation: Special permission is required for ADU construction in properties of historical importance. Existing architecture is respected. Traditional design elements are retained. Clearance from the Heritage Conservation Committee is required. Special materials are used to maintain historical significance.
  • Easements: ADU construction may be prohibited in the Easement areas. Utility equipment is kept safe. Access road rights are respected. Legal documents are reviewed. The necessary permissions are obtained. Special construction plans are developed.

Pre-Approved Northridge ADUs

We have a wide range of pre-approved ADU designs for Northridge. These designs conform to local regulations and standards. Pre-approved plans speed up the permit process. These designs include different shapes and styles. You can make changes according to your needs.

Our team will help you choose the best design. Pre-approved plans save time and money. We make necessary modifications to your liking. Adherence to quality and safety standards is ensured. The latest technologies and materials are used.

Start Your ADU Project Today!

This is the right time to start your ADU project in Northridge. Our expert team is with you. We will guide you through the entire process from permit to construction. We are committed to making the ADU of your dreams come true. We have modern design and economical solutions. Contact us today for professional services.

FAQs

The permitting process can take 2-3 months, depending on the complexity of the project.

Inspections for foundation, framing, plumbing, electrical, and final approval are typically required.

If your property involves significant slope adjustments, a grading plan may be necessary.

While not required, a separate address may be helpful for utilities and mail.

Yes, building an ADU requires permits for construction, zoning compliance, and occupancy.

Yes, garage conversions are a popular option for creating ADUs in Northridge.

ADUs may be permitted, but additional regulations for preservation and design may apply.

Yes, all ADUs must meet California’s Title 24 energy efficiency standards.

CALL US NOW