Zoning Regulations in Whittier

Special zoning regulations apply to ADU construction in Whittier. Our team is well versed with all these rules. Special permits are required to build ADUs in residential areas. Following the rules we will provide you with the best solutions.

Zoning Regulations

ADU Size Limitations

The size of the ADU depends on the size of the plot. Our team will create the best design according to your plot. As per norms, the minimum size of an ADU can be 400 square feet and a maximum of 1200 square feet.

Lot Size Table

Lot Size Single-Family (Maximum Floor Area Allowed) Duplex and Multi-Family (Maximum Floor Area Allowed)
4,800 1,100 sq ft 950 sq ft
7,200 1,400 sq ft 900 sq ft
9,600 1,000 sq ft 1,100 sq ft
14,400 2,600 sq ft 1,500 sq ft
19,200 2,800 sq ft 1,800 sq ft

ADU Height Limitations

The height of the ADU in Whittier cannot be higher than the main house. Normally the maximum height of the ADU is allowed up to sixteen feet. Height of up to twenty feet may be allowed under special circumstances. We will give you detailed information about it.

Building coverage

The total building coverage with ADU in the plot should not exceed fifty percent. Our team will survey your plot and plan for proper coverage. Following the rules, we will prepare the ideal design.

Location

The location of the ADU should be behind or next to the main house. The ADU cannot be built on the road side. Our team will inspect your plot and select the most suitable location. This is important.

Single-Family Properties:

  • Detached ADUs: For separate ADUs, the minimum distance will have to be kept at six feet. Our team will create the best design following all the rules. Special attention will be paid to the rules of distance from the main house.
  • Attached ADUs: Connected ADUs should be integrated with the main house. There are special design requirements for this. Our team will provide you with the best solutions. Adherence to the rules will be ensured.

Duplex and Multi-family Properties:

  • General Requirements: Additional rules apply for ADUs in multi-family properties. Parking and open spaces have special requirements. Our team will follow all these rules.
  • Zoning Specifics: The ADU will be constructed under special zoning rules. There are different rules for each zone. Our team will provide you with detailed information.

Exterior details

The exterior design of the ADU should match the main house.  Special attention will be paid to color, material and architectural style. Our team will create beautiful and harmonious designs.

Parking

ADU requires an additional parking space. This rule may be relaxed in certain circumstances. Our team will provide you with detailed information.

Setbacks and Buffer Zones

The minimum distance from the border will have to be kept four feet. It is important to follow the rules of the buffer zone. Our team will give you detailed information about these rules.

Minimum Lot Area (RF Zone)

The minimum plot size in the RF zone should be five thousand square feet. There is no exemption in this rule. Our team will assess your plot.

Zone Table

Zone Minimum Lot Area
R-18 4,800 sq. ft.
R-9 7,200 sq. ft.
R-6 9,600 sq. ft.
R-4 14,400 sq. ft.
R-2 19,200 sq. ft.

Connection For Utilities

Utility connections are very important to ADUs. Our team will arrange electricity, water and sewer connections. All connections will be established according to local codes. We will ensure that all utilities are connected in a safe and efficient manner. The meter and connection point will be carefully selected.

Gas lines and internet connections will also be provided. We will obtain all the necessary permits and arrange inspections. All connections will be completed on time in coordination with utility companies. Our team will take care of all technical aspects.

Fire Safety

It is mandatory to install smoke detectors and carbon monoxide alarms for fire safety. There should be an emergency exit. Our team will follow all safety standards. Inspection of fire marshals will be arranged.

Room Specifications

Room Specifications

  • Sleeping Areas: The bedroom should have a height of at least seven feet. The size of the window should be ten percent of the floor area of the room. Emergency exit arrangements are mandatory.
  • Kitchen: There should be adequate lighting and ventilation in the kitchen. The counter space should be at least twelve square feet. Proper distance will be kept between the sink and stove.
  • Bathroom: Exhaust fan and ventilation are mandatory in the bathroom. Waterproof material will be used on the floor. The minimum size of the shower or bathtub should be thirty inches.
  • Storage Spaces: The storage space should have an area of at least twenty square feet. The height of the shelves should not exceed seven feet. There should be adequate lighting.

Short-term Rentals and Home Occupations Regulations

Special permits are required to deliver short-term rentals. Different rules apply to running a business from home. Our team will give you detailed information about these rules.

Building Codes

All construction work will be carried out in accordance with California building codes. Safety and quality standards will be strictly adhered to. Our team will arrange regular inspections.

ADU Permit Whittier Guidelines

ADU Permit

All necessary documents will be prepared to obtain the permit. Our team will help you with the application process. All departmental clearances will be obtained in time.

Permit Cost Table

Permit Type Cost
Building Permit $2,400 – $5,500
Electrical Permit $300 – $600
Plumbing Permit $250 – $900
Mechanical Permit $200 – $600
Demolition Permit $150 – $300
Landscaping Permit $75 – $150

Property Requirements

Different requirements must be met depending on the size and condition of the property. Special attention will be paid to drainage and land condition. Our team will do a detailed inspection.

Parking

A car parking lot is mandatory for ADUs. The size of the parking should be nine feet by eighteen feet. Some areas may have additional requirements.

Front setbacks

A distance of at least twenty feet from the side of the road must be maintained. Different rules apply for corner plots. Our team will follow the exact parameters.

Side and rear setbacks

A minimum distance of four feet is mandatory in the side setback. A setback of five feet will have to be kept at the back. These rules may change under special circumstances.

Open space and rear yards

The area of open space should not be less than thirty percent of the total plot. The back courtyard should have enough greenery. Landscaping will be planned.

Properties That Qualify

Eligible properties for ADU construction in Whittier have to meet several criteria.  Factors such as plot size, zoning rules, and current use are taken into account. Our team will verify the eligibility by evaluating your property. Also, we will help you prepare all the required documents.

According to local regulations, single-family homes, duplexes, and multi-family buildings may be eligible for ADUs. Our team will conduct a detailed inspection of your property and discuss all possible options. We are committed to providing you with the best solutions.

Development Standards

Single-family

  • Attached: The same architectural style with the main house is required for connected ADU. Electricity and water connections can be shared. Our team will produce the integrated design.
  • Detached: Separate ADUs will require independent utility connections. Minimum distance has to be maintained from the main house. Attractive and functional design will be produced.

Duplex properties

  • Attached: Special permits will be required for ADUs attached in duplexes. It is important to reconcile with the existing structure. All safety standards will be followed.
  • Detached: Special rules for parking and yard space will apply for separate ADUs in duplexes. Independent entry points will be arranged. Special care will be taken of privacy.

Multifamily properties

  • Attached: Adherence to additional safety standards is required for connected ADUs in multi-family buildings. Special fire protection arrangements will be made. Community rules will be followed.
  • Detached: Landscaping and buffer zones are important for separate ADUs in multi-family properties. Proper parking arrangements will be made. Community facilities will be taken care of.

Junior ADUs (JADUs)

The size of the junior ADU should be less than five hundred square feet. It is constructed inside the main house. The kitchen can be shared.

Property Designations

Property Designations

  • Flood Zones: Special precautions are necessary for ADU construction in flood areas. The floor height should be above the flood level. Proper drainage arrangements will be made.
  • Geohazard Zones: Additional safety standards will be followed in earthquake and landslide prone areas. Soil testing is mandatory. Special construction techniques will be used.
  • Historic Designation: Special permission is required for ADU construction in properties of historical importance. Existing architecture will be respected. Cultural importance will be maintained.
  • Easements: Public use and utility equipment will be respected. All legal rights will be checked before construction. Proper documentation will be done.

Pre-Approved Whittier ADUs

The city of Whittier has already approved some standard ADU designs. Selecting these designs speeds up the permit process. Our team will provide you with detailed information about these options.

Pre-approved designs are available in various sizes and styles. These include options ranging from one bedroom to two bedrooms. Every design conforms to local regulations and standards.

Start Your ADU Project Today!

Start your ADU project with ADU Builders CA. Our expert team will work with you to make your dreams come true. Contact us today and get a free consultation.

FAQs

Fire sprinklers are only required if the primary dwelling also has them.

ADUs typically require a minimum setback of 4 feet from property lines.

Separate utility connections are optional but not mandatory for most ADUs.

The checklist includes design review, site plans, structural plans, permits, and financing.

You need site plans, floor plans, construction details, and a permit application.

Inspections typically include foundation, framing, plumbing, electrical, and final review.

Work with licensed professionals to design and construct your ADU to code.

You may need to revise and resubmit plans to the Whittier planning office.

Submit complete and accurate documents and work with professionals to avoid delays.

ADUs under 750 sq. ft. are exempt from impact fees.

Yes, it includes checking structure, utilities, and obtaining conversion permits.

Yes, ADUs must meet height, size, and setback requirements, and their design should complement the primary dwelling.

Yes, but you need to ensure the ADU fits within allowable lot coverage and setback rules.

ADUs must comply with California Building Codes, including foundation, framing, insulation, plumbing, and electrical requirements.

Yes, ADUs must comply with California Energy Code (Title 24) and include energy-efficient windows, insulation, and appliances.

You must submit a revised plan to the Whittier Building Department and may incur additional fees or inspections.

Yes, ADUs near high-noise areas (e.g., busy roads) must include soundproofing measures such as double-glazed windows.

Yes, you can appeal to the city’s Planning Commission or seek adjustments to meet requirements.

Lot coverage varies by zoning but generally allows for up to 50% of the lot to be developed, including the primary dwelling and ADU.

CALL US NOW